To Evaluate a Cable Schedule
- Start the Output Manager.
- Select the Conceptual_Cable Schedules from the Conceptual Design node.
- After selecting the desired evaluation of which files should be evaluated then they will be set in the Collaboration Manager.
- In the following menu request lock for the evaluate Panel and Design files (with the right mouse button Select all and then Request lock) and confirm the selection with OK.
- Click OK.
- Click Preview to display a preview of the report.
- You can export the report to an MS-EXCEL format using one of the following methods:
- Determine the location and file name.
- The output is created in Microsoft Excel.