Target Path
|
Click the Browse button to navigate to the location
where the backup will be stored or enter the path directly into the field.
|
Project Selection
|
The following options determine the information to be
backed the next time a project drawing is opened using the backup executable.
- Modified Today: Will
only backup the changes made from today's session.
- Modified Since Last
Backup: Will back all of the changes made since the last backup was performed.
- Backup only
ProjectWise Projects: Will only backup changes made to ProjectWise Projects.
Note you must be logged into a ProjectWise project when launching the backup
executable for this to backup the project to the ProjectWise datasource.
|
Source Path
|
The Source Path pane lists the paths of the
project(s) to be backed up.
Multiple directory paths can be defined and multiple
projects can be backed up from each directory if desired. All of the backups
are stored in the single Target directory.
- Include Subfolders:
When enabled for a specific path, all projects in any sub folder are subject to
be automatically backed based on Project Selection option chosen.
|
Add
|
Displays a Browse for Folder dialog where you can select the path
to the directory where the project(s) to be backed are stored. If you are
logged into a ProjectWise datasource then you are able to browse the datasource
for a directory to backup the project(s) to. You are able to create a backup
directory if one has not been previously created.
|
Remove
|
Removes the selected source path from the list.
|
OK
|
Click
OK to save the backup settings. These
settings will be used whenever you launch the application using the backup
executable.
|