Creating a foundation schedule (table) for a foundation job
- Create a foundation job.
- Perform the design.
- Select the Detail and Schedule Drawing tab in the Main View window.
- Select the option for Schedule Drawing.
- (Optional) Click the Save Drawing Notes
- Click Save Drawing As…. The Save As dialog box (drawings) opens.
- Specify a name for the drawing and select the location where it will be saved.
- Click Save.