Job Name |
Should be unique for each job. By default Job Name is set as Drilled Pier Job.
|
Design Method |
There are three methods for analyzing/designing drilled pier:
- API Method (based on API RP 2A-WSD)
- FHWA 1999 Method (based on FHWA-IF-99-025)
- Vesic method (based on Design of Pile Foundations, by A.S. Vesic, 1977, National Transportation Research Board, National Research Council)
|
Next >
|
Proceeds the Wizard to the next step.
|
Cancel
|
Exits the Wizard without creating a new Drilled Pier Job.
|